Your home battery is installed, but do you know how to use it, where its records are and who to contact if something goes wrong? A useful home battery handover should answer those questions before the installation team leaves, or clearly identify anything still outstanding.
There is a specific reason to focus on handover in 2026. The Clean Energy Regulator introduced additional installation photography requirements covering critical battery labelling from 1 March. For homeowners, this makes handover a practical opportunity to ask about labels, operating instructions and the completed installation records—not to attempt an electrical inspection yourself.
This checklist focuses on the transition from installation to ownership. For earlier purchasing decisions, read My Energy Group’s guide to what to consider before installing a home battery.
Why battery labels deserve attention
In its battery installation safety announcement, published on 25 February 2026, the Clean Energy Regulator said installers would need clear, geotagged and timestamped photographs of critical labelling from 1 March 2026. It explained that compliant labels support installers, emergency responders and future trades working on battery systems.
These are installer evidence requirements within the Small-scale Renewable Energy Scheme. They do not make homeowners responsible for preparing compliance photographs or judging whether an installation satisfies electrical standards.
At handover, ask the installer to show you the relevant labels and explain their purpose. If a label appears missing, damaged or unreadable, request clarification in writing. Do not create replacement wording yourself or treat a photograph as proof that the entire installation is compliant.
Build a complete handover folder
The Australian Government’s installation day and after guidance recommends keeping the contract, specifications, operating instructions, maintenance advice, warranties, commissioning sheet and electrical safety certificate or jurisdictional equivalent. Its battery guidance also explains that written statements are required under the Cheaper Home Batteries Program covering key information about the battery and installation.
Use that guidance to request a clearly organised package for your solar and battery installation. Suggested folders include:
- Purchase records: the accepted quote, contract, invoice and agreed variations.
- Equipment records: installed system specifications, product manuals and identifying details.
- Installation records: commissioning information and the electrical safety documentation applicable in your state or territory.
- Operation: monitoring instructions, maintenance guidance and the system-specific shutdown and isolation procedure.
- Support: product and installation warranties, plus retailer and installer contact details.
Ask which documents apply to your particular job rather than assuming every jurisdiction uses the same certificate name. If something will arrive later, record who will provide it and the expected delivery date.
Match the installed equipment to the agreement
Government installation guidance advises checking that equipment matches the quote or contract. Apply that principle to the completed battery package: ask the installer to identify the battery, inverter and any separately agreed monitoring or backup equipment.
Request an explanation of any difference between the accepted design and the final installation. Keep agreed changes with the original paperwork, including any revised scope or price.
For a combined installation, discuss the solar and storage components together. MEG’s solar panel system service information provides a starting point for that conversation. The handover should describe your actual installation, not simply repeat a standard package description.
Get a demonstration of normal operation
The government’s installation guidance says the installer should explain basic inverter functions and provide access to any included monitoring app. Its battery guidance explains that battery management settings can support different priorities, including backup, bill management and virtual power plant participation.
Before the demonstration ends, ask the installer to walk you through:
- How to identify the system’s normal operating status.
- Where to see battery charge and charging or discharging activity.
- Which settings reflect your agreed operating priorities.
- Which controls you can use and which require professional assistance.
- What to do if the display or app reports a fault.
Try accessing the monitoring platform on your own device while help is available. Ask who to contact if access stops working, and request written instructions rather than relying on memory.
Confirm exactly what backup includes
The Australian Government’s battery consumer guidance makes an important distinction: a battery must be configured to provide electricity during an outage, and not every system can do so. Depending on the design, backup may cover the whole property, selected circuits or only part of a three-phase installation.
If backup was included in your contract, ask for the supported circuits and operating limits to be identified in the handover records. Also ask whether the solar system can recharge the battery while the grid is unavailable; government guidance describes different arrangements with different outage behaviour.
Request an installer-led explanation or suitable demonstration of the agreed functionality. Do not simulate an outage by experimenting with switchboard controls. Avoid treating a charged battery or an illuminated app screen as evidence that every appliance will operate during a blackout.
Understand the settings before changing them
Government battery guidance notes that the retailer or installer usually configures the battery for the customer’s needs, potentially including electricity pricing details. It also advises discussing reconfiguration when the electricity plan changes.
Ask for a plain-English summary of the initial settings and the reasons behind them. If the system includes a backup reserve or scheduled charging, ask how those choices relate to your agreed priorities.
Keep this discussion separate from promised financial outcomes. Handover confirms what was installed and how it is configured; it does not establish guaranteed savings or payback. The government warns that battery savings may not recover the purchase cost within the warranty period.
Know the support pathway
Government guidance recommends retaining warranty information for both products and installation, along with retailer and installer contacts. Its battery guide also recommends clarifying which warranties are the responsibility of the installer or manufacturer.
Ask who receives the first fault report, what information they need and how to escalate an unresolved concern. Keep written records of outstanding issues. For a system that is not working as expected after activation, the government’s installation guidance recommends contacting the company that sold it and putting concerns in writing.
Finish with a clear outstanding-items list
Before closing the handover conversation, list any missing documents, unanswered questions or remaining connection steps. Government guidance notes that installation completion does not always mean a solar system can immediately be switched on; processes differ between states and territories. Ask the installer to confirm the status of your particular installation.
If you are planning storage, explore MEG’s energy storage information and make handover expectations part of the initial discussion. You can also contact My Energy Group to discuss your property and confirm current service availability.
Sources and linked pages checked on 4 November 2026, Australia/Sydney. This is general consumer information, not an electrical compliance assessment or operating procedure. Follow the instructions supplied for your installed system. This article was prepared in this response only; nothing was published or sent externally.