Commencing 1 September 2026

Cut the upfront cost of commercial battery storage

Eligible NSW businesses can access significant certificate-based incentives for commercial batteries through the expanded Peak Demand Reduction Scheme.

Eligibility, incentive value and savings are project-specific and subject to final scheme requirements.

20 kWh–30 MWhSupported battery range
Solar optionalBattery-only projects may qualify
Upfront supportDelivered through PRCs
One claim per siteUnder BESS4 or BESS5
How the incentive works

Not a voucher. A certificate-based upfront discount.

The NSW business battery incentive is delivered through the Peak Demand Reduction Scheme. Eligible projects create Peak Reduction Certificates (PRCs), which have a market value that may be applied as an upfront project discount.

  • Value varies with usable battery capacity and inverter size
  • Installing eligible new solar may unlock a higher incentive tier
  • PRC market prices and scheme calculations affect the final value
  • My Energy Group provides a site-specific estimate before you proceed
Eligible battery project
→
Peak Reduction Certificates

Designed to reduce peak grid demand

The scheme rewards qualifying batteries that can help NSW businesses reduce electricity demand when the grid is under pressure.

Available categories

Support for businesses of every scale

The expanded PDRS introduces two commercial battery activities for small businesses through to major industrial energy users.

BESS4

Small and medium businesses

20–200 kWh

Usable battery capacity for retail, offices, farms, hospitality, medical facilities, workshops and warehouses.

  • One eligible claim per site
  • Maximum six-hour battery duration
  • Systems below 100 kWh may also qualify for federal support
BESS5

Commercial and industrial sites

200 kWh–30 MWh

Designed for manufacturing, cold storage, industrial operations, large warehouses and commercial property portfolios.

  • Incentive applies to up to the first 10 MWh
  • One eligible claim per site
  • Additional technical and safety requirements apply
Government modelling examples

How the incentive could improve project payback

There is no fixed rebate amount. These examples illustrate the potential scale of support for qualifying projects.

Small–medium business

200 kWh battery

With new 100 kW solarApprox. $65,800
Indicative payback7 years → 3.8 years
Battery-only incentiveApprox. $44,100
Battery-only payback9 years → 5.8 years
Commercial & industrial

5 MWh battery

With new 2.5 MW solarApprox. $1.65m
Indicative payback7 years → 5.1 years
Battery-only incentiveMore than $1.1m
Battery-only payback10 years → 6.5 years

Examples are based on government modelling and are not quotations or guarantees. Actual outcomes depend on eligibility, energy use, site conditions, equipment, tariffs, PRC prices and final scheme rules.

Solar is optional

A battery can qualify without new solar

Battery-only installations may qualify where storage reduces peak demand, shifts consumption or improves resilience. Pairing eligible new solar with the battery may produce a higher incentive and stronger financial return.

Compare my options
Battery onlyTarget peak demand and time-of-use costs without adding solar.
Battery with existing solarStore surplus generation and use more of your own solar energy.
New solar + batteryPotentially unlock a higher incentive tier and an integrated energy solution.
Key requirements

Could your project qualify?

Every project needs an individual assessment. These are the headline requirements businesses should consider.

Check my eligibility
01
Eligible NSW business site

The installation must be at an eligible non-residential site in NSW. Residential buildings and data centres are excluded.

02
Installation from 1 September 2026

The qualifying installation must take place on or after the scheme commencement date.

03
Compliant equipment and installation

Applicable equipment listings, installer accreditation, safety standards and evidence requirements must be satisfied.

04
Correct system configuration

Capacity, inverter size, duration and operating configuration must meet the activity requirements.

05
One BESS4 or BESS5 claim per site

The commercial battery incentive is generally limited to one eligible activity claim at each site.

Commercial benefits

More than an upfront incentive

↓

Reduce demand charges

Discharge during high-demand periods to reduce costly peaks on eligible tariffs.

☀

Use more solar

Store surplus rooftop generation instead of exporting it at a lower value.

↔

Shift energy use

Charge during lower-cost periods and discharge when electricity is more expensive.

↯

Improve resilience

Add purpose-designed backup functionality for selected essential business loads.

◫

Manage energy smarter

Use monitoring and controls to optimise battery operation against your load profile.

+

Prepare for the future

Support potential demand-response and energy-market opportunities where available.

Our process

From energy data to a commissioned system

My Energy Group designs commercial battery projects around measurable site value—not simply the largest battery that fits.

Consult

Define your site, energy costs and objectives.

Analyse

Review bills, interval data, demand and solar output.

Design

Size the battery, inverter and optional solar.

Assess

Estimate incentives, savings and payback.

Deliver

Install, commission and support your system.

Start planning before September 2026

Energy analysis, engineering, network approvals and equipment lead times can take time. Assess your site now so your business is ready for the scheme commencement.

Frequently asked questions

NSW business battery incentive FAQs

When does the NSW business battery incentive start?

The BESS4 and BESS5 activities are scheduled to apply to qualifying installations completed on or after 1 September 2026. Final eligibility remains subject to the rules applying when the system is installed.

Is this a fixed government rebate?

No. Eligible projects generate Peak Reduction Certificates. The upfront value depends on the number of certificates created and their market price.

Can I install a battery without solar?

Yes. Solar is not mandatory. Eligible battery-only projects may qualify, although installing eligible new solar with the battery can increase the available support.

Can an existing solar site qualify?

Potentially. A qualifying battery may be added to a business that already has solar. The final incentive depends on the project configuration and applicable scheme rules.

Can NSW and federal incentives be combined?

A qualifying BESS4 battery below 100 kWh may also be eligible for the federal Cheaper Home Batteries Program. The project must satisfy both programs' requirements.

Will the battery provide backup power?

Only where backup operation is specifically included in the system design. My Energy Group can assess essential loads and recommend an appropriate configuration.

How much could my business receive?

There is no universal amount. Contact My Energy Group for an assessment based on your energy data, battery size, inverter capacity, solar configuration and estimated PRC value.

Request your free commercial battery assessment

Discover whether your NSW business may qualify and compare battery-only, existing-solar and new solar-plus-battery options.